SCOTI Navbar
What One Warm Load Costs | SCOTI
A refrigerated truck on the road

SCOTI · Cost calculator

What one warm load costs.

A load arrives warm and the customer refuses it. Nobody saw it drifting. Put in your numbers.

Calculator

Put in your numbers. See what one lost load costs.

Results update as you type. Nothing is saved.

Example values. Change them to yours.
$
$
$
$
hrs
$
$0 Cost of one incident
$0 Cost per year

Preventing one incident a year saves you $0.

Product value
$0
Disposal and handling
$0
Replacement freight or redelivery
$0
Credits, penalties, chargebacks
$0
Staff time 0 hrs at $0
$0
One incident
$0

Per year is one incident times 0 incidents.

Why

Why it happens.

Nobody does anything wrong. Nobody is watching either.

Busy shifts

Loads go on before the trailer is cold, or a setpoint gets keyed wrong.

A portal nobody watches

Reefer temperature data sits in a separate portal nobody watches at 3 AM.

The customer finds out first

The first person to know is often the customer refusing the load.

How

How SCOTI catches it.

Works with the truck and trailer data you already have.

01

Before loading

SCOTI checks the trailer is cold.

It flags a trailer that has not reached its setpoint before the load goes on.

02

In transit

It watches the temperature.

It reads the reefer temperature against your limits on every stop.

03

Alert

It alerts the yard and dispatch.

The alert comes while there is still time to save the load. If nobody acts, it escalates.

04

Record

Every event is logged.

Each event goes on the load record.

Execution Gap Report

We'll prove it first.

No contract, no IT project.

Phase 01

Days 1 to 14

We connect read only to the truck and trailer data you already have. You send a daily route export.

Phase 02

Day 15

We walk you through what we found on your fleet:

  • Unplugged reefers
  • Temperature excursions
  • Off route events
  • Hours versus plan
  • Doors opened off site
SCOTI Footer